Key takeaways
- A morning queue at the merchant costs wages and a billable slot; work out the real cost for your firm before deciding it is cheaper than delivery.
- Place orders the afternoon before, against a job reference, and collect from a click-and-collect point or have them delivered.
- Use a simple rule: delivery to site for bulky or heavy items, collection for small urgent parts, and a yard drop for anything shared across jobs.
- Material prices are still rising, so quotes need a validity period and a clear materials clause.
- Give one person ownership of ordering each day, even in a two-van firm.
What a merchant run really costs
Ask most owners how long their engineers spend at the merchant and the answer is 'twenty minutes'. Ask the engineers and you hear about the queue at the counter at 7.30, the item that turned out to be out of stock, the second merchant across town, and the drive back to a job that was meant to start at 8. Half a morning is common.
That time has a price even before you count lost work. In 2026 the median gross hourly pay of full-time electricians was £19.54[1], and for plumbers and heating installers it was £19.00[2]. Roofers were at £16.91 and gardeners and landscapers at £14.81[3][4]. Employer National Insurance, pension, van running costs and the job you could have done in that slot all come on top.
Example: a fictional four-van heating firm finds each engineer spends about 75 minutes a week waiting at trade counters or driving to a second merchant. At around £19 an hour in wages alone, that is roughly £95 a week across the team before overheads, plus about five hours of work that could have been sold. Over a year that is close to £5,000 in wages and around 260 hours of sellable time, spent standing in queues.
Order ahead: the night-before rule
The single habit that saves the most time is placing tomorrow's orders today. Most trade merchants offer online or phone ordering with click and collect or next-day delivery on account, and the counter staff can pick an order overnight that would take them twenty minutes to find with a queue behind you.
Review tomorrow's diary by 2pm
Whoever runs the diary checks every job booked for tomorrow and lists the materials each needs that are not standard van stock.
Confirm the part with the engineer who surveyed
A two-minute call or message with photos saves the wrong valve or the wrong size of trunking. If the job came from a phone enquiry, check the make and model the customer gave against a photo.
Place the order against the job reference
Put the job number in the order reference or purchase order field. It makes invoices easy to match and stops parts for one job being used on another.
Choose collect or deliver
Use the decision table below. Book delivery slots before the merchant's cut-off, which is often early afternoon for next-day delivery.
Send the engineer a single message
One line per job: what is ordered, where it will be (van, site, yard or collection point) and the order number to quote.
Collect, deliver to site or deliver to the yard
There is no single right answer. The table gives a starting point most small firms can adapt.
| Situation | Best option | Why |
|---|---|---|
| Bulky or heavy items: boilers, cylinders, sheet materials, aggregates, roofing battens | Deliver to site | Saves loading time and van space; merchant crews often have kerbside cranes or tail lifts |
| Small, urgent part needed today | Collect, ideally from a click-and-collect point | Delivery will not arrive in time; picking in advance avoids the counter queue |
| Items used across several jobs this week | Deliver to your yard or unit | Consolidates deliveries and lets you top up vans in one go |
| Customer is out until the afternoon | Deliver to your yard, not to site | Unattended deliveries to homes go missing or get rained on |
| Specialist part with uncertain stock | Reserve by phone, then collect | Avoids a wasted trip to an empty shelf |
| Job inside a restricted parking area | Deliver to site with a booked slot | One delivery vehicle parked briefly is easier than your van making extra trips |
When you choose delivery to site, tell the customer what will arrive, roughly when, and where it should go. A pallet of tiles left on a shared drive causes more complaints than late arrival. If the customer agrees to accept a delivery, record that agreement on the job.
Writing an order the counter gets right first time
- Use the merchant's product code where you can, not a description. 'A 22mm valve' can mean six products.
- State quantities in the unit the merchant sells: lengths, packs, rolls or boxes.
- Name an acceptable alternative for anything that might be out of stock, so the merchant does not ring you on a roof.
- Include your account number, the job reference and who is collecting, with their name.
- Ask for a picking confirmation by text or email, and check it against the order before the engineer leaves the job they are on.
- Keep a list of your top fifty items with codes in a shared note; it makes ordering fast for whoever is covering the office.
Rising material prices and your quotes
Ordering habits also protect your margin. The construction material price index for all work rose 7.2% in the year to September 2026, and 6.2% for repair and maintenance work[5]. A quote that sits with a customer for two months can easily be priced on old materials costs.
- Give every quote a validity period, such as 30 days, and say that materials are priced at today's rates.
- For larger jobs, order the main items when the customer accepts and the deposit clears, not the week you start.
- If a merchant tells you of a price rise on a key item, update your price list that day rather than at the end of the month.
- Where the customer supplies some materials, agree in writing who is responsible if they are wrong or faulty.
If you need to change a quoted price because materials have gone up, tell the customer before you start and get their agreement. Do not add it to the final invoice as a surprise.
Getting more from your merchant account
A trade account is more than a credit line. Most branches will do far more for a firm that orders in a predictable way, and the time to ask is when you set the new routine up, not in the middle of a busy week.
- Ask the branch for its order cut-off times for next-day delivery and for same-day picking, and put both on the office wall.
- Ask whether the branch will hold a small reserved stock of the items you use every week, so they are never out when you need them.
- Agree how short deliveries and substitutions will be handled: a text before the van leaves the branch is far better than discovering a missing item on site.
- Check that every invoice line carries your job reference. If it does not, ask the branch to add it to the order system, because it is what lets you charge materials back to the right job.
- Review the account once a quarter: the items you bought most, any price changes, and any deliveries that went wrong.
Firms that use two or three merchants often get better service by giving most of their routine work to one branch and keeping the others for specialist items. It also makes the night-before ordering routine simpler for whoever is covering the office.
Deciding who collects what
In many small firms everybody collects their own parts, which means everybody visits the merchant. Giving the task to fewer people usually works better.
- One person owns ordering each day. In a two-van firm that might be the owner; in a larger firm, the office or a dispatcher.
- If you have an apprentice or labourer, they collect click-and-collect orders and drop them at sites before the engineer arrives, where practical.
- Engineers only go to the merchant for unplanned parts found on the day, and they ring the office first so the part can be reserved.
- One engineer collects for two jobs when sites are close, with a clear note of which bag is whose.
- Anything collected and not used goes back to the yard, not into the footwell.
This links closely to how you manage the stock carried on each van. If engineers keep going to the merchant for the same fittings, those items belong on the van list, and the guide to van stock management shows how to set one up.
Example: one week before and after
Example: a fictional three-van electrical firm in the Midlands logs merchant visits for a week. Eleven trips, three of them to a second branch because the first had no stock, and two jobs started more than an hour late. The next week the office places all known orders by 3pm the day before, uses click and collect for small parts and books two site deliveries of cable and containment. Merchant trips fall to four, every job starts within its arrival window, and the owner spends one hour a day on ordering instead of three engineers each spending most of a morning.
The real gain is not only time. Jobs start on time, customers see the van arrive when promised, and the engineer who is not fighting a counter queue at 7.30 arrives in a better mood. Before-and-after photos of delivered materials also help settle any question about what arrived, as covered in the photo routine guide.
Frequently asked questions
Is it cheaper to collect materials or have them delivered?
For small, urgent parts, collection is often fine if the order is picked in advance. For bulky items or anything that would take an engineer away from a job for an hour or more, delivery is usually cheaper once you count wages and the work you could have done.
When should I order materials for a job?
For routine jobs, the afternoon before. For larger jobs, order the main items once the customer has accepted the quote and paid any deposit, and check lead times for anything specialist.
Should materials be delivered to the customer's home?
Only when someone will be there to receive them, there is a safe place agreed with the customer, and the items are too bulky for the van. Otherwise deliver to your yard.
How do I stop parts for one job being used on another?
Put the job reference on every order, bag or label collected items by job, and make it a rule that parts are only moved between jobs with the office's agreement.
References
Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14.5a: hourly pay (gross), full-time (opens in a new tab) ↑
Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14.5a: hourly pay (gross), full-time (opens in a new tab) ↑
Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14.5a: hourly pay (gross), full-time (opens in a new tab) ↑
Office for National Statistics (2026). Annual Survey of Hours and Earnings 2026 provisional, Table 14.5a: hourly pay (gross), full-time (opens in a new tab) ↑
Department for Business and Trade (GOV.UK) (2026). Construction building materials: commentary October 2026 (opens in a new tab) ↑